Which action typically follows well drilling?

Prepare for the NGWA General Drilling Exam. Study with flashcards and multiple choice questions, each question has hints and explanations. Get ready for success!

Well development procedures are a crucial step that follows well drilling. Once a well is drilled, it is essential to ensure that it operates efficiently and optimally. Well development involves processes aimed at enhancing water flow into the well, removing any fine materials and debris that may obstruct water movement, and improving the overall water quality.

This can include actions such as surging, airlifting, or pumping to displace particulates and allow the well to reach its designed yield. Developing the well means fostering a stable environment for water extraction and ensuring that the groundwater source can provide the required quantity and quality of water for its intended use.

In contrast, immediate closure of the site could lead to unaddressed issues with the well, such as sediment blockage. Soil stabilization may be a consideration in some circumstances but is not a standard procedure that directly follows drilling. Similarly, installation of chemical treatments is not a routine action immediately following drilling unless specific water quality issues need to be addressed, which is not considered part of typical well development procedures.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy